Leading the Build™ · Facilities Tool

Site Search Tracker

Turn a list of candidate sites into a side-by-side decision. Set your program once, add sites, and the tool calculates buildable space, whether each site fits, and the real cost per student — live.

Selected project

1 · Your program & cost assumptions

Set these first — every site is measured against them. Change any value and the whole table recalculates.

students at full build-out
~90–120 is typical
ground-up hard cost
existing-building hard cost
used if a site's FAR is blank
Program SF needed
Sites tracked
0
That fit the program
0

Map

Hide ▲

Viewing:
Site / Address Owner Map / Coords Status Asking / Acq. Lot SF FAR Buildable SF Existing SF Type Max students Fit / Gap Fits? Total Project Cost TPC / SF TPC / Student Risk
No sites yet. Click + Add site or Load sample sites to begin.
© 3BRE LLC · Leading the Build™ · Site Search Tracker · Internal MVP.  Formulas mirror the master spreadsheet: Buildable SF = Lot × FAR · Hard = Program SF × ($/SF by type) · TPC = Acquisition + Hard + Soft · TPC/Student = TPC ÷ enrollment.
Not legal or financial advice — a planning tool. Your work is saved in this browser only.
© 2026 3BRE LLC.  Leading the Build™ is a proprietary methodology of 3BRE LLC.  Confidential — not for reproduction or distribution. |  Terms of Service